<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>

靈新煤礦西天河下安全開采技術綜合分析

Comprehensive Analysis of Safe Mining Underneath the Xitian River at Lingxin Coal Mine of China

  • 摘要: 為了研究靈新煤礦河下開采引起的覆巖破壞規律和地表移動規律,采用工程地質調查、彩色鉆孔孔電視、鉆孔沖洗液漏失量法、物理與數值模擬、地應力測量及地表監測等多種研究手段,獲得了礦區地應力分布規律、工作面開采的垮落帶和導水裂縫帶的高度、巖層移動規律及礦壓顯現規律,實現了L3414綜采工作面安全開采和環境保護的雙重目標.

     

    Abstract: In order to study the damage of overburden rock and the surface subsidence caused by water-control mining at Lingxin Coal Mine, the in-situ stress distribution law, the damage height and crack height, the overburden rock displacement law and the ground pressure law were abtained by means of engineering geological investigation, color bore-bole TV inspecting, leakage monitoring in drilling fluid, simulation experiment, numerical computing, in-situ stress measurement and subsidence measurement. The result shows that safe mining at L3414 working face underneath the Xitian River and environmental protection can be implemented ultimately.

     

/

返回文章
返回
<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
www.77susu.com