提前/拖延調度問題最優解的結構

Structure of Optimal Solution for E/T Scheduling

  • 摘要: 討論了帶有4項懲罰指標的提前/拖延調度問題,目的是確定最優公共交貨期和確定最優排序.給出了最優公共交貨期的確定方法,提出了聯合懲罰因子的概念,并討論了最優解的結構.

     

    Abstract: A kind of E/T scheduling problem with four penalty factor is discussed in order to determine the optimal sequences and optimal common due date. A method about how to determine common due date is presented, the concept of combinative penalty factor is proposed, and the structure of optimal solution is discussed.

     

/

返回文章
返回
<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
www.77susu.com