<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>

轉爐煉鋼廠鋼包轉運的物理模型

Physical Model of Ladle Cycling for Converter Plant

  • 摘要: 在對煉鋼廠鋼包轉運過程進行解析中,給出了鋼包運行時間因素的數學描述,提出鋼包轉運過程的"柔性時間"概念和鋼包使用個數的計算方法.同時,對鋼包運行的優化進行了分析,建立了鋼包轉運的物理模型.

     

    Abstract: On the bases of developing technology of high speed continuous casting, this paper analyzed the process of ladle transporting in converter plant of Guangzhou iron & Steel Co. Ltd.was analyzed, and time factor of ladle cycling in mathematics was described. A new conception of flexible time was set forth, and a kind of method on quantity of ladle calculating was provided. Meanwhile, by studied optimization of ladle transporting in the production route thoroughly, physical model of ladle cycling was established.

     

/

返回文章
返回
<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
www.77susu.com