<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>

存在不確定性干擾的生產計劃——庫存控制過程最優化

Dynamic Method for Solving Process Control Problem of Productive Planning and Material Inventory under the Influence of Indefinite Disturbance

  • 摘要: 給出了在存在不確定性干擾的情況下,生產計劃-庫存控制過程最優化的動態提法.在此基礎上提出了一個在線克服不確定性干擾尋求最優控制的實用算法.

     

    Abstract: A dynamic formulation is presented for solving optimal process control problem of productive planning and material inventory under the influence of indefinite disturbance. Based on the formaulaiton, a practical algorithm is provided. A numerical example is given.

     

/

返回文章
返回
<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
www.77susu.com