<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>

礦山10m3電鏟動臂、斗桿應力的有限元分析

Analysis of the Stress of Giant Equipments Boom and Long Arm by Using Finite Element Method

  • 摘要: 確定了挖掘機動臂和斗桿的工作載荷和約束條件,然后分別采用平板單元和三維等參單元將動臂和斗桿離散,利用有限元法分析應力分布。

     

    Abstract: The work load and restrain condition of power shovel's boom and long arm are determined. Then, the method of finite element which are plate element and three-dimensional isoparamenter element is used to analyse the stress distribution.

     

/

返回文章
返回
<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
www.77susu.com