<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>

CC-DR和CC-DHCR的生產物流模型

On Mathematical Models of Logistics System in CC-DR and CC-DHCR

  • 摘要: 運用大系統建模方法。從連鑄-連軋生產物流過程的工藝要求出發,建立了連鑄-軋制、煉鋼-連鑄和煉鋼-連鑄-軋制生產物流數學模型,以此為基礎提出了二步制訂最佳生產物流計劃的方法。

     

    Abstract: Using modelling method of large scale system, and bounding up with the technological requirements in CC-CR, the mathematical models of logistics system in CC-DR and CC-DHCR are builded, which include the models in steelmaking-casting, casting-rolling and steelmaking-casting-rolling. Based on them, two-stage optimization method for production plan is discussed.

     

/

返回文章
返回
<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
www.77susu.com