<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>

軋鋼企業訂貨、排產及調整的集成化

The Integration of Order, Arranging Uaily Plan and Adiusting for a Steel Rolling Mill

  • 摘要: 對軋鋼企業訂貨.排產及調整進行了集成化研究。使用多級計劃與調整模型實現了訂貨、排產及調整的并發控制與動態調整.并用專家系統方法完成了上述工作。與傳統辦法相比,克服了各階段之間分離的缺點。

     

    Abstract: The integration of order, arranging daily plan and adjusting can be completed for the simultaneously control and dynamic adjustment of order, arranging and adjusting by using the model of multi-plan and adjustment integrated, and the above works can also be completed by expert system. Compared to the traditional methods, this method overcomes the disadvantages of separations among different stages.

     

/

返回文章
返回
<span id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
<span id="fpn9h"><noframes id="fpn9h">
<th id="fpn9h"></th>
<strike id="fpn9h"><noframes id="fpn9h"><strike id="fpn9h"></strike>
<th id="fpn9h"><noframes id="fpn9h">
<span id="fpn9h"><video id="fpn9h"></video></span>
<ruby id="fpn9h"></ruby>
<strike id="fpn9h"><noframes id="fpn9h"><span id="fpn9h"></span>
www.77susu.com